Method
|
Settings apply the desired slope method.
- Rise / Run.
- % Percent.
- Degree.
For a selected method the Tool Settings dialog
displays appropriate label to the value input control.
|
Slope value input
|
Enter a value(s) for the amount of slope for the
selected method.
- Rise : Run —
Accepts the vertical rise and horizontal run values respectively for Rise/Run
slope method.
- Percentage —
Accepts a value in the scale of percentage for % Percent slope method.
- Slope Degree —
Accepts the angular inclination value for Degree slope method.
Switching the Method to another displays the equivalent slope
value.
|
Slope Direction
|
Direction of slope can be either Up or Down. Slope run direction
is defined by the location on pipe of the selection data point.
|
Slope Selected Pipe
|
The setting applies slope to the highlighted segment
of the route.
|
Continue Through Risers
|
The setting applies slope to all of the connected
route components through risers bypassing components that exceed the locate
tolerance such as vertical pipe. Fittings are regenerated, and connections are
maintained.
|
Process Pipe Within (degrees)
|
Defines a tolerance angle from horizontal for
locating slope. Pipes that exceed the tolerance value are exempted in the slope
process.
|